Ship Systems Ship Status Anti-Matter Reactor Nuclear Reactor 10% Solar Power Plant 15 16 3 4 5 6 7 8 9 10 11 12 13 14 PSI Life Support Air Pressure PSI 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Life Support System 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Power Consumption 1 2 3 4 5 6 7 8 9 10 PSI PSI Hull Sealant Pressure 10%

Outer Hull: Liquid sealant  pressure 6.3 psi and holding.

Inner Hull: sealed and secure

Central Core: sealed and secure.

Command Section: sealed and secured

Habitat Section: damage to Levels 1, 2, 3, and 4

>Level 4: sealed and secure

Communication Section: sealed and secured and online

Engineering Section: sealed and secured>Anti-matter: offline

Systems Check:

Computer: online

Manual Control: online

Auto Controls: offline

Life Support: operating at 92%.

>Pressure loss in Habitat Section Levels 1, 2 and 3: compensating

Backup Systems: 79% in use


Ship Log Book ~ Recorded Data