Ship Status:
Outer Hull: construction 87% complete. Air pressure 2.7 psi and leaking. The slight leak is due to ongoing construction
Inner Hull: construction 72% complete. Air pressure 10.5 psi and holding on all levels.
Command Section: construction complete
Habitat Section: construction 79% complete
Communication Section: construction complete
Engineering Section: construction 91% complete
Computer: online
Life Support: operating at 95%
Backup Systems: 100% and standing by